Spot the difference: new design for Mersey Gateway bridge
The new Mersey Gateway bridge is probably the most important (and only) mayor transport scheme in the region at the moment.
As reported today, the design of the bridge is going back to planning as £30m of costs had to be stripped out of the scheme.
Can you spot the difference? The top picture is the new design.


Difficult to spot as even the clouds are the same but if one looks really close, you will see that the tolls on the second are higher than the tolls on the first.